www.ing-aigner.at - 19.05.2012 01:50:06
Plant construction
Our services in the area of office space expansion include heating, cooling, ventilation, plumbing and measurement-control-automation technology.
morePlant construction
Installation of a steam boiler plant at the tank and oil depot Lobau/Vienna.
morePlant construction
Installation of a steam boiler plant with 2.4 tons of steam/h.
morePlant construction
Installation of a low-temperature boiler, a gas burner, an outdoor underfloor heating system and a ventilation system for the interior facilities.
morePlant construction
Replacement of cooling systems 1 and 6 at Vienna airport.
morePlant construction
Our services range from heating and cooling systems to ventilation, plumbing and measurement-control-automation technology.
morePlant construction
Design planning, delivery and installation of a steam boiler plant for process steam generation.
morePlant construction
New construction of the logistics center at Spedition Quehenberger in Enns.
morePlant construction
Our spectrum of services includes cooling and ventilation for the events area at AEC in Linz.
morePlant construction
Plumbing for central heating, ventilation and cooling systems.
morePlant construction
Installation of an area substation for capacities between 1 - 10 MW.
morePlant construction
Our spectrum of services ranges from heating and ventilation to cooling, plumbing and measurement-control-automation technology for office buildings.
morePlant construction
Scope of services: heating, ventilation, cooling, plumbing and latent cold storage.
morePlant construction
Scope of services: heating, ventilation, cooling, plumbing and piping for all media.
morePlant construction
Our spectrum of services includes sinter hub line fabrication as well as heating, ventilation, cooling and plumbing work.
morePlant construction
Installation of a solar plant with approx. 200 m² of collector surface area for the Republic of Austria.
morePlant construction
Refurbishment of the central steam system in Budweis.
morePlant construction
Scope of services: plumbing, heating, steam, compressed air, cooling, clean steam, wastewater and gas piping installation.
morePlant construction
The Stroh/Miscanthus heating station in Pichl, near Wels, has a heat requirement of
600 MWh/a and a pipeline length of 450 m.
morePlant construction
Biomass heating station with output capacity of 1,200 kW.
morePlant construction
Pellet plant with a heat requirement of 460 MWh/a and output capacity of 240 kW.
morePlant construction
Biomass heating station with output capacity of 800 kW.
morePlant construction
Biomass local heating system with output capacity of 900 kW and a peak load of 1,100 kW.
morePlant construction
Wood chip plant with output capacity of 320 + 500 kW.
morePlant construction
Biomass heating station with a basic load of 2,000 kW and a peak load of 4,000 kW.
morePlant construction
Biomass heating station with a basic load of 8,000 kW and a peak load of 4 x 6,000 kW.
morePlant construction
Biomass heating station with a basic load of 2 x 2,500 kW and a peak load of 6,000 kW.
morePlant construction
Biomass local heating network with a pipeline length of approx. 800 m and output capacity of 100 + 240 kW.
morePlant construction
Biomass local heating station and micro network with a pipeline length of 270 m and output capacity of 220 kW.
morePlant construction
Biomass micro network with a pipeline length of 460 m and output capacity of 290 kW.
morePlant construction
Local heating station with a basic load of 1,000 kW augmenting existing capacity of 300 kW and 12 m³ of buffer storage.
morePlant construction
Biomass heating station with a basic load of 6,000 kW for the municipal district heating station as the client.
morePlant construction
Biomass heating station with a basic load of 8,000 kW for the municipal district heating station as the client.
morePlant construction
Biogas plant for the company Spitzwieser Biogas KEG in Neukirchen/Enknach.
morePlant construction
Piping for the entire heating and biogas piping network in stainless steel and polyethylene, piping for the pumping station, and more...
morePlant construction
Wood chip boiler with output capacity of 100 + 150 kW.
morePlant construction
Intra-facility micro network with a basic load of 960 kW and a peak load of 1,600 kW.
morePlant construction / plant contracting
Wood chip heating station for a state educational facility and boarding school with a heat requirement of 900 MWh/a.
morePlant construction / plant contracting
Wood chip heating station with a heat requirement of 3,000 MWh/a and a pipeline length of 10 m, connected to an existing district heating network.
morePlant construction / plant contracting
Wood chip plant with a heat requirement of 720 MWh/a and output capacity of 500 + 85 kW.
morePlant construction / plant contracting
Biomass heating station with a heat requirement of 5,000 MWh/a and a pipeline length of 100 m.
morePlant construction / plant contracting
Biomass micro network with a heat requirement of 1,500 MWh/a, pipeline length of 290 m and output capacity of 320 + 500 kW.
morePlant construction / plant contracting
Biomass heating station with a heat requirement of 2,100 MWh/a, a pipeline length of 50 m and output capacity of 1,000 kW.
morePlant construction / plant contracting
Biomass heating station with output capacity of 1,500 kW and a peak load of 2 x 550 kW.
morePlant construction / plant contracting
Local heating station with a basic load of 400 kW, 12 m³ of buffer storage and a peak load of 700 kW.
morePlant construction / plant contracting
Local heating station with an intra-facility network of approx. 1,350 m, a basic load of 400 kW, buffer storage of 12 m³ and a peak load of 700 kW.
more